This page is updated quarterly. Completed projects accumulate during the fiscal year (July 1 to June 30) and are reset in the first quarter's listing (after September).
| Status:
| Project Type:
| Project Number:
| Project Title: |
| Completed |
Contract Research |
TR10 07-35, RI 07-035 |
Impacts of Public Policy on Rail Development in Missouri |
| Active |
Contract Research |
TR10 07-47, RI 07-047 |
I-64 Economic and Regional Mobility Study |
| Active |
Contract Research |
TR10 07-47A |
The New I-64 Economic and Regional Mobility Study DED Portion |
| Completed |
Contract Research |
TR10 07-50, RI 07-050 |
Impacts of Public Policy on Air Service Development in Missouri |
| Completed |
Contract Research |
TR10 07-52, RI 07-052 |
Quick Test for Percent Deleterious Materials |
| Completed |
Contract Research |
TR10 07-62, RI 07-062 |
Evaluation of Work Zone Enhancement Software Programs |
| Active |
Contract Research |
TR10 08-18, RI 08-018 |
FY09-11 MoDOT Customer Satisfaction Tracking - Statewide Telephone Survey Tracker Measures 5a, 12j, 13c, 17d, 18b |
| Active |
Contract Research |
TR10 08-25, RI 08-025 |
Evaluation of Variable Speed Limits in the St Louis, Missouri, Metropolitan Area |
| Completed |
Contract Research |
TR10 08-26, RI 08-026 |
Adaptive Signal Timing, Evaluation of InSync System on MO 291, Kansas City, MO |
| Completed |
Contract Research |
TR10 08-30, RI 08-030 |
Engineering Specifications for Construction of Truck Only and Passenger Vehicle Only Travelways In Missouri: Phase 1 |
| Completed |
Contract Research |
TR10 08-31, RI 08-031 |
Development of the Framework for a Water Quality Monitoring System: Controlling MoDOT's Contribution to 303(d) Listed Streams in Missouri |
| Completed |
Contract Research |
TR10 08-32, RI 08-032 |
Library Systems: Operations and Information Services |
| Completed |
Contract Research |
TR10 09-04, RD 09 004 |
Evaluation of Freeway Motorist Assist and Arterial Service Patrol Program |
| Active |
Contract Research |
TR10 09-11, RD 09 011 |
MTI-Bridge-1a-Structural Steel Coatings for Corrosion Mitigation |
| Active |
Contract Research |
TR10 09-12, RD 09 012 |
MTI-Bridge-1b-Spalling Solution of Precast-Prestressed Bridge Deck Panels |
| Active |
Contract Research |
TR10 09-13, RD 09 013 |
MTI-Bridge-2a-Reliability-Based Evaluation of Bridge Components for Consistent Safety Margins |
| Active |
Contract Research |
TR10 09-14, RD 09 014 |
MTI-Bridge-2b-Coated Steel Rebar for Enhanced Concrete-Steel Bond Strength and Corrosion Resistance |
| Active |
Contract Research |
TR10 09-15, RD 09 015 |
MTI-Bridge-2c-Alternative and Cost-Effective Bridge Approach Slabs |
| Active |
Contract Research |
TR10 09-16, RD 09 016 |
MTI-Bridge-2d-Calibration of Load and Resistance Factors in LRFD Foundation Design Specifications |
| Active |
Contract Research |
TR10 09-22, RD 090221 |
MTI-Geotech-Task 1-Site Characterization |
| Active |
Contract Research |
TR10 09-22, RD 090222 |
MTI-Geotech-Task 2-Bridge Foundations |
| Active |
Contract Research |
TR10 09-22, RD 090223 |
MTI-Geotech-Task 3-Establishing Risk |
| Active |
Contract Research |
TR10 09-22, RD 090224 |
MTI-Geotech-Task 4-LRFD Specifications |
| Active |
Contract Research |
TR10 09-24, RD 09 024 |
Library Systems FY 2010-2011 |
| Completed |
Contract Research |
TR10 09-29, RD 09 029 |
Roadway Review |
| Active |
Contract Research |
TR10 09-30, RD 09 030 |
MoDOT Customer Satisfaction Tracking - Motor Carrier Services |
| Active |
Contract Research |
TR10 09-31, RD 09 031 |
MoDOT Customer Satisfaction Tracking - Motorist Assist Survey |
| Active |
Contract Research |
TR10 09-32, RD 09 032 |
MoDOT Customer Satisfaction Tracking - Involved Public Survey |
| Active |
Contract Research |
TR10 09-33, RD 09 033 |
MoDOT Customer Satisfaction Tracking - Planning Partners Survey |
| Active |
Contract Research |
TR10 09-34, RD 09 034 |
MoDOT Customer Satisfaction Tracking - Right Transportation Solution Survey |
| Active |
Contract Research |
TR10 09-36, RD 09 036 |
Seed Head Suppression |
| Active |
Contract Research |
TR10 09-37, RD 09 037 |
Vegetation Management in Center Median of I-70 and I-44 |
| Active |
Contract Research |
TR10 09-47, RD 09 047 |
Evaluating the Benefits of Dynamic Message Signs on Missouri’s Rural Corridors |
| Completed |
Contract Research |
TR10 09-49, RD 09 049 |
Rail Enhancement Analysis Phase II |
| Active |
Contract Research |
TR10 10-01 |
Evaluation of Life Expectancy of LED Traffic Signals and Development of a Replacement Schedule |
| Active |
Contract Research |
TR10 10-06 |
Alternative Energy Sources for MoDOT |
| Active |
Contract Research |
TR10 10-07 |
Light Detection and Ranging (LiDAR) Technologies |
| Active |
Contract Research |
TR10 10-13 |
Diverging Diamond Interchange (I-44 & Route 13) Performance Evaluation |
| Completed |
Contract Research |
TR10 10-15 |
kcICON Customer Survey |
| Active |
Contract Research |
TR10 10-18 |
Missouri River Freight Corridor Development Plan. |
| Active |
Contract Research |
TR10 10-25 |
Highway Safety Driver Survey |
| Completed |
Contract Research |
TR10 10-26 |
Base Grouting Drilled Shafts-MTI Geotechnical Program |
| Completed |
Contracts Other |
TA10 54-01, RI 54 001 |
TRB Highway Research Correlation Service Subscription |
| Completed |
Contracts Other |
TA10 PF00 |
AASHTO Technical Service Program |
| Active |
Contracts Other |
TR10 CONT |
Research and Development Contingencies |
| Completed |
Contracts Other |
TT10 07-01 |
National Highway Institute Training |
| |
|
|
|
| Completed |
In-House SPR Research |
TR10 09-19, RD 09 019 |
Evaluation of 3M Tape vs. Poly-Carb Striping and Striping Warranty |
| Completed |
In-House SPR Research |
TR10 92-04, RI 92 004 |
Statewide Study of Cathodic Protection |
| Completed |
In-House SPR Research |
TR10 01-55, RI 01-055 |
Construction of Crack Free Concrete Bridge Decks |
| Active |
In-House SPR Research |
TR10 04-30, RI 04-030 |
Evaluation of Aluminum-Zinc-Indium (Al-Zn-In) Alloy for Galvanic Cathodic Protection of Bridge Deck A12112 |
| Completed |
In-House SPR Research |
TR10 06-04, RI 06-004 |
Evaluation of Quiet Pavement Project on Route 340, St. Louis County |
| Active |
In-House SPR Research |
PD10 06-06, PD 06-006 |
Propex Fabric Used as Bridge Membrane |
| Completed |
In-House SPR Research |
TR10 07-54, RI 07-054 |
Development of Specifications for Using Self-Consolidating Concrete in P/S Girder Members |
| Completed |
In-House SPR Research |
TR10 08-39, RI 08-039 |
Median Guard Cable Evaluation Phase II |
| Active |
In-House SPR Research |
TR10 09-42, RD 09 042 |
Evaluation of Windspire Wind Generators at I-44 Conway Welcome Center |
| Active |
In-House SPR Research |
TR10 09-50, RD 09 050 |
Prestressed Box-Beam Bridges |
| Active |
In-House SPR Research |
TR10 10-02 |
Rumble Strips and Pavement Condition |
| Active |
In-House SPR Research |
TR10 10-08 |
Evaluation of Pave Guard Deck Heating System |
| Active |
In-House SPR Research |
TR10 10-27 |
Evaluation of the SCI 100 GM Crash Attenuator in District 4 and District 6 |
| |
|
|
|
| Completed |
Pooled Fund Contract |
TR10 06-38, RI 06-038 |
Development of Hand-Held Thermographic Inspection Technologies |
| Active |
Pooled Fund Contract |
TR10 09-28, RD 09 028 |
Performance of Recycled Asphalt Shingles in Hot Mix Asphalt |
| Active |
Pooled Funds |
TPF-5(021) |
Base Funding for North Central Superpave Center |
| Active |
Pooled Funds |
TPF-5(048) |
Midwest States Accelerated Testing |
| Active |
Pooled Funds |
TPF-5(065) |
Traffic Control Device (TCD) Consortium (Traffic) |
| Active |
Pooled Funds |
TPF-5(068) |
Long-Term Maintenance of Load and Resistance Factor Design Specifications |
| Active |
Pooled Funds |
TPF-5(078) |
Wind Induced Vibration of Stay Cables |
| Active |
Pooled Funds |
TPF-5(081) |
Smart Work Zone Deployment Initiative (Traffic) |
| Active |
Pooled Funds |
TPF-5(099) |
Evaluation of Low Cost Safety Improvements |
| Active |
Pooled Funds |
TPF-5(105) |
Transportation Library Connectivity |
| Active |
Pooled Funds |
TPF-5(156) |
Mississippi Valley Freight Coalition Pooled Fund |
| Active |
Pooled Funds |
TPF-5(159) |
Technology Transfer Concrete Consortium |
| Active |
Pooled Funds |
TPF-5(165) |
Development of Design Guide for Thin and Ultra-Thin Concrete Overlays of Existing Asphalt |
| Active |
Pooled Funds |
TPF-5(176) |
Traffic Analysis Simulation (Traffic) |
| Active |
Pooled Funds |
TPF-5(177) |
Improving Resilient Modulus Test Procedures for Unbound Materials |
| Active |
Pooled Funds |
TPF-5(180) |
Full-Scale Seimic Performance Testing on US Highway Bridge Column |
| Active |
Pooled Funds |
TPF-5(187) |
Updating U.S. Precipitation Frequency Estimates for the Midwestern Region |
| Active |
Pooled Funds |
TPF-5(193) |
Midwest States Pooled Fund Crash Test Program |
| Active |
Pooled Funds |
TPF-5(205) |
Implementation of Pavement Mixture Design and Analysis (MDA) Track of Concrete Pavement Road Map |
| Active |
Pooled Funds |
TPF-5(208) |
Accelerated Performance Testing on the 2009 NCAT Pavement Test Track |
| Active |
Pooled Funds |
TPF-5(209) |
Support of the Transportation Curriculum Coordination Council (TCCC) |
| Active |
Pooled Funds |
TPF-5(218) |
Clear Roads Winter Highway Operations |
| Active |
Pooled Funds |
TPF-5(410) |
National Cooperative Highway Research Program (NCHRP) |